QT4-25 Automatic cement block machine

Short Description:

QT4-25 Main technical parameters   Overall size 3600*1600*2400mm Host machine power 18.6KW Molding period 15-20S Vibration force 50-60KN Pallet Size 850×550×25mm Pallet quantity 1000pcs Weight 3T Mixer model JD500 Voltage According to local condition Theoretical workshop area : 60m2 , need about 3-4workers .the office , curing area and stacking area to arrange according your fact status..  2.QT4-25 Production Capacity QT4-25  Production capacity Size(LxWxH) Pcs/Mould...


  • FOBQINGDAO PRICE: Negoitable
  • Min.Order Quantity: 1SET
  • Supply Ability: 100 SETS/MONTH
  • Port: QINGDAO PORT
  • Payment Terms: L/C,D/A,D/P,T/T
  • :
  • Product Detail

    Product Tags

    1. QT4-25 Main technical parameters

     

    Overall size 3600*1600*2400mm Host machine power 18.6KW
    Molding period 15-20S Vibration force 50-60KN
    Pallet Size 850×550×25mm Pallet quantity 1000pcs
    Weight 3T Mixer model JD500
    Voltage According to local condition

    Theoretical workshop area : 60m2 , need about 3-4workers .the office , curing area and stacking area to arrange according your fact status..

     2.QT4-25 Production Capacity

    QT4-25  Production capacity

    Size(LxWxH)

    Pcs/Mould

    Pcs/ Hr

    Pcs/ 8 Hr

    400X100X200

    7

    1008

    8064

    400X150X200

    5

    720

    5760

    400X200X200

    4

    576

    4608

    400X250X200

    3

    432

    3456

    240x115x53

    26

    4750

    38000

    we can design molds according to your requests

    Capacity Mentioned is indicative only actual capacity varies with operator efficiency and material quality etc

     3.Other costs

    A) Client needs build a 50–60m3 workshop.Total factory 1000m2

    B) Client needs arrange 1000pcs pallets.Wooden pallet/bamboo pallet/rubber pallet are all accepted.If wooden or bamboo pallet,20mm thickness is enough.

    C) If no power at site,50KVA generator needs to be prepared

    D) Main line specification (transformer output copper wire)

    220V three phases3*35+1*16

    380V/415V three phases 3*25+1*16

     

    4.Labor required

    1 Labor for material feeding into mixer

    1 Labor for machine operation

    2 Labor for transporting blocks to storage area.

     

     

    5.Raw material formula

    Raw material proportion for your reference:

    a. Concrete: 10% cement, 30% sand, 60% small stones

    b. 10% cement, 90% stone powder

    c. 10% cement, 30% fly ash, 60% stone powder


  • Previous:
  • Next:

  • Send your message to us:

    INQUIRY NOW
    • * CAPTCHA: Please select the Key

    Related Products

    INQUIRY NOW
    • * CAPTCHA: Please select the Key